The editor will briefly introduce how to install and debug the Hydraulic Press.
- 1. The installation of the hydraulic machine, the installation foundation should be prepared in advance before the installation of the hydraulic machine, and the concrete foundation is generally used. The hydraulic machine body is fixed by bolts, so bolt holes should be reserved when the concrete foundation is made, and the hydraulic machine is installed before pouring and fixing. For the installation of other parts of the hydraulic press, refer to the assembly drawings of the parts, and install them according to the matching requirements given in the drawings.
- 2. Commissioning of the hydraulic press. After all the installation work of the hydraulic press is completed, on-site commissioning must be carried out. Press the start button to see if the hydraulic press can complete various working conditions in sequence. Check whether the hydraulic press hardware or control system is working normally by watching and listening during the debugging process. In addition, it is necessary to check whether all control buttons and pressure gauges can work normally. After debugging for a period of time, if it runs normally, the hydraulic press can be officially delivered for use.
The above content is how to solve the failure of the small hydraulic press, I hope it can be helpful to everyone. If you want to know more about hydraulic press, please call Dongguan China Machinery Co., Ltd. We will serve you wholeheartedly.
Please keep the source and address of this article for reprinting:How to install and debug hydraulic press
Reprint Statement: If there are no special instructions, all articles on this site are original. Please indicate the source for reprinting.:Cnc Machine Wiki,Thanks!^^